๐Ÿ”ดOverdue
๐ŸŸ Breaching in 3 days
๐ŸŸกPending review
๐Ÿ”ตAwaiting resubmission
๐ŸŸฃRev C or higher
๐ŸŸขApproved this week
โฌ†Back to top
ITQAN Works
Document Control
LOCAL
T1 โ€” Submittals
T2 โ€” Correspondence
T3 โ€” RFIs
T4 โ€” Contracts
T5 โ€” Close-out
Dashboard
โš™ Config
๐Ÿ‘ท Contractors
โšก Priority Actions
๐Ÿ“Š Views
๐Ÿ—บ Journey Map
Submittal Register
๐Ÿ“– Submittal Guide
0
Rejected
0
Expected
0
Total
Status
All
Pending
Overdue
Approved
Rejected
Legacy
Expected
Document Type
All Types
๐Ÿ“ Shop Drawings
๐Ÿงฑ Material Approvals
๐Ÿ“‹ Method Statements
โœ… ITPs
๐ŸŽจ Samples & Mock-ups
๐Ÿ“š O&M
Discipline
All Disciplines
Civil
Arch
Mech
โšก Proactive signals Tap any card for the full list ยท Tap Ask Claude for AI guidance
First pass approval
โ€”
% approved without rejection
Avg review days
โ€”
Receipt to response
Open submittals by discipline
Reviewer workload
Revision history โ€” multiple cycles
Critical โ€” overdue and due within 3 days
n8n AUTOMATION
โš  Not yet connected. The rows below are the planned automations, not live ones โ€” no reminders are currently being sent automatically. Use the SLA Tracker on each document's Review/Consult step for now.
SLA 50% reminder โ†’ reviewerPLANNED
SLA 80% chaser โ†’ reviewer + managerPLANNED
Overdue escalation โ†’ PMPLANNED
Weekly MDR digest โ†’ allPLANNED
WhatsApp alert โ†’ TwilioOFF
Power BI feed โ†’ Supabase viewsCONFIG
Supabase Connection
Project URL
Anon Key
Settings โ†’ API in your Supabase project.
Never use the service_role key here. Anon key only.
UAQ Document Number Convention
Define what each segment of the UAQ official document number means. The system will decode any UAQ number automatically once you configure this.
1
2
3
4
5
6
7
Preview:
ITQAN Procedure Code โ€” How It Works
The ITQAN procedure code is generated automatically when you decode a UAQ number. It is never used in official correspondence. It drives all internal logic โ€” checklists, warnings, SLA rules, n8n automation, and signature requirements.

Format: ITQAN-T[Track]-[Discipline]-[DocType]-Rev[X]-[Mode]
ITQAN-T1-CV-DWG-RevA-NEW
Track 1 ยท Civil ยท Drawing ยท First submission ยท Standard procedure applies
ITQAN-T1-CV-DWG-RevB-RESUB
Track 1 ยท Civil ยท Drawing ยท Second cycle ยท Resubmission gate, one prior rejection
ITQAN-T1-ME-MTH-RevA-LEGACY
Track 1 ยท Mechanical ยท Method Statement ยท Backfilled โ€” pre-dates your tenure
ITQAN-T1-AR-DWG-RevC-GHOST
Track 1 ยท Architecture ยท Drawing ยท Placeholder only โ€” not yet in hand
The procedure code updates automatically โ€” you never type it manually. When Tracks 2โ€“5 are added, the code will reflect T2 (Correspondence), T3 (RFI), T4 (Contracts), T5 (Close-out) accordingly.
SLA Standards โ€” UAQ's Actual Review Periods
Enter UAQ's real contractual SLA period (in days) for each document type. Once set, new documents of that type default to the correct period automatically instead of a generic guess. Leave blank to keep the current default shown as a placeholder.
Reviewer Roster โ€” Who Reviews What
Assign the correct reviewer(s) to each discipline. Once set, the DC Process Checklist's "Route" step checks the assigned reviewer against this roster and blocks the step with a clear warning if it doesn't match โ€” instead of accepting any name typed into the document.
n8n + Power BI
n8n base URL
PBI endpoint
Power BI connects to Supabase via PostgreSQL connector. It reads the pre-built views directly โ€” no push needed. Supabase โ†’ Settings โ†’ Database โ†’ Connection string โ†’ URI mode.
Contractor Registry โ€” MASAR Destination
Tap a contractor to see their full document journey
โšก DC DAILY PRIORITY BRIEFING
Actions ordered by urgency and consequence ยท Proactive DC guidance
By Phase
By Contractor
By Discipline
By Status
Expected โ€” Not Yet In
Construction Document Journey Map โ€” MASAR Destination
Tap a row label to filter ยท Tap a phase number for the full doc list ยท Tap any pill for live DC status
VIEW: All tracks โ€” tap a row label on the left to filter
T1 Shop Drawings
T1 Material Approvals
T1 Method Statements
T1 ITPs
T1 Samples
T1 O&M
T2 Correspondence
T3 RFIs
T4 Contracts
T5 Close-out
TRACK
17 docs
Pre-Construction
M1โ€“2
213 docs
Mobilisation
M2โ€“3
319 docs
Substructure
M3โ€“8
420 docs
Superstructure
M8โ€“18
522 docs
Envelope & MEP
M14โ€“24
620 docs
Fit-out & Finishes
M20โ€“28
712 docs
Completion
M26โ€“30
WHAT HAPPENSContracts signed. Programme set. Design finalised. Team mobilising.Site setup. Temp works. Piling plant arrives. First submittals issued.Piling. Pile caps. Ground beams. Basement walls. Waterproofing.Columns. Slabs. Cores. Structural steel. Frame rising.Facade. Roof. MEP rough-in. Lifts. Main plant installation.Partitions. Ceilings. Flooring. Joinery. FF&E.Commissioning. Testing. Snagging. As-builts. Handover.
T1 โ€” Shop Drawings
DWG ยท 14โ€“21d ยท Blocks construction
tap to filter
๐Ÿ“ Temp works dwg๐Ÿ“ Piling layout๐Ÿ“ Site hoarding๐Ÿ“ Pile cap details๐Ÿ“ Ground beam layout๐Ÿ“ Waterproofing details๐Ÿ“ Column schedule๐Ÿ“ Slab reinforcement๐Ÿ“ Steelwork connections๐Ÿ“ Facade panels๐Ÿ“ MEP coordination๐Ÿ“ Lift shaft details๐Ÿ“ Fit-out drawings๐Ÿ“ Ceiling layout๐Ÿ“ Flooring details๐Ÿ“ Snagging drawings
T1 โ€” Material Approvals
MAT ยท 14โ€“21d ยท Blocks procurement
tap to filter
๐Ÿงฑ Concrete mix design๐Ÿงฑ Reinforcement steel๐Ÿงฑ Waterproofing system๐Ÿงฑ Piling material๐Ÿงฑ Structural steel๐Ÿงฑ Formwork system๐Ÿงฑ Facade cladding๐Ÿงฑ Glazing system๐Ÿงฑ MEP equipment๐Ÿงฑ Floor tiles๐Ÿงฑ Joinery materials๐Ÿงฑ Paint system
T1 โ€” Method Statements
MTH ยท 14d ยท HSE ยท Blocks work start
tap to filter
๐Ÿ“‹ Mobilisation MS๐Ÿ“‹ Excavation MS๐Ÿ“‹ Piling MS โš ๏ธ๐Ÿ“‹ Dewatering MS๐Ÿ“‹ Waterproofing MS๐Ÿ“‹ Concrete pour MS๐Ÿ“‹ Formwork MS๐Ÿ“‹ Crane ops MS๐Ÿ“‹ Facade installation MS๐Ÿ“‹ Lift installation MS๐Ÿ“‹ Fit-out MS๐Ÿ“‹ Hazardous materials MS
T1 โ€” ITPs
ITP ยท 14d ยท Blocks all inspections
tap to filter
โœ… Site setup ITPโœ… Piling ITP โš ๏ธโœ… Concrete ITPโœ… Waterproofing ITPโœ… Structural ITPโœ… Welding ITPโœ… Facade ITPโœ… MEP ITPโœ… Finishes ITPโœ… Commissioning ITP
T1 โ€” Samples & Mock-ups
SMP ยท 14โ€“21d ยท Blocks finish work
tap to filter
๐ŸŽจ Concrete finish sample๐ŸŽจ Facade mock-up๐ŸŽจ Glazing sample๐ŸŽจ External finishes๐ŸŽจ Floor tile sample๐ŸŽจ Paint colour sample๐ŸŽจ Room mock-up
T1 โ€” O&M & Product Data
OAM ยท 21โ€“28d ยท Blocks handover
tap to filter
๐Ÿ“š MEP product data๐Ÿ“š Lift product data๐Ÿ“š Fit-out O&M๐Ÿ“š Fire systems O&M๐Ÿ“š Full O&M package โš ๏ธ๐Ÿ“š Warranties package
T2 โ€” Correspondence
Letters ยท NCRs ยท Notices ยท Minutes
tap to filter
โœ‰ Mobilisation noticeโœ‰ Programme submissionโœ‰ Site instructionsโœ‰ Meeting minutesโœ‰ NCRs โ€” pilingโœ‰ EOT noticeโœ‰ Progress minutesโœ‰ NCRs โ€” concreteโœ‰ EOT noticeโœ‰ Acceleration noticeโœ‰ NCRs โ€” MEPโœ‰ Technical minutesโœ‰ PC noticeโœ‰ Snagging NCRsโœ‰ Completion certificateโœ‰ Defects notice
T3 โ€” RFIs
7โ€“14d SLA ยท Urgent โ€” stops work
tap to filter
โ“ Design clarificationโ“ Site condition RFIโ“ Spec interpretationโ“ Piling RFIโ“ Ground condition RFIโ“ Structural RFIโ“ Coord clash RFIโ“ MEP routing RFIโ“ Facade interface RFIโ“ Fit-out RFIโ“ Commissioning RFI
T4 โ€” Contracts & Legal
No fixed SLA ยท Restricted access
tap to filter
โš– Main contractโš– Performance bondโš– Insurance certsโš– Sub-contractsโš– Early VOsโš– VO โ€” ground conditionsโš– Claim noticeโš– VO โ€” design changesโš– EOT assessmentโš– VO โ€” MEP changesโš– Prolongation claimโš– VO โ€” fit-out scopeโš– Final accountโš– Defects bond
T5 โ€” Close-out
As-builts ยท Handover ยท Blocks final payment
tap to filter
๐Ÿ— As-built starts โ€” substructure๐Ÿ— As-built โ€” structure๐Ÿ— As-built โ€” MEP๐Ÿ— Test records๐Ÿ— As-built โ€” fit-out๐Ÿ— Snagging register๐Ÿ— Handover dossier โš ๏ธ๐Ÿ— Completion certificate๐Ÿ— Commissioning records
โœ• Close
โœ• Close
Correspondence Register
โœ‰ Correspondence Guide โ–ผ
0
Pending
0
Overdue
0
Approved
0
Rejected
0
Expected
0
Total
Status
All
Pending
Overdue
Approved
Rejected
Expected
Document Type
All Types
โœ‰๏ธ Letters/Notices
๐Ÿ“ Minutes
โš ๏ธ NCRs
๐Ÿ“‘ Contract/Programme
Correspondence Register
RFI Register
โ“ RFI Guide โ–ผ
0
Pending
0
Overdue
0
Approved
0
Rejected
0
Expected
0
Total
Status
All
Pending
Overdue
Approved
Rejected
Expected
Discipline
All Disciplines
Civil
Arch
Mech
RFI Register
Contract Register
๐Ÿ’ฐ Contracts Guide โ–ผ
0
Pending
0
Overdue
0
Approved
0
Rejected
0
Expected
0
Total
Status
All
Pending
Overdue
Approved
Rejected
Expected
Document Type
All Types
๐Ÿ’ฐ Variation Orders
๐Ÿ“‘ Contract Docs
Contracts Register
Close-out Register
๐Ÿ Close-out Guide โ–ผ
0
Pending
0
Overdue
0
Approved
0
Rejected
0
Expected
0
Total
Status
All
Pending
Overdue
Approved
Rejected
Expected
Document Type
All Types
๐Ÿ“ As-Builts
๐Ÿงช Test/Snagging
๐Ÿ Handover
Close-out Register
๐Ÿ“– What Are Submittals?
โœ• Close
A submittal is any document a contractor sends to get technical approval or review before they build, buy, or install something. The contractor cannot legally proceed with that scope of work until the submittal is approved.

There are six types of submittals in construction. They are all processed through Track 1 โ€” but each has a different review chain, different SLA, and different consequences if delayed. Knowing the difference is essential DC knowledge.
Quick comparison โ€” all six types
TypeReviewed bySLABlocks construction?Blocks handover?
Shop drawingDiscipline engineer14โ€“21 daysYES โ€” hard stopNo
Material approvalEngineer + architect14โ€“21 daysYES โ€” hard stopNo
Method statementEngineer + HSE14 daysYES โ€” hard stopNo
ITPQC + consultant QA14 daysYES โ€” hard stopNo
Sample / mock-upArchitect / designer14โ€“21 daysPartial โ€” finish work onlyNo
O&M / product dataFacilities / engineer21โ€“28 daysNoYES โ€” blocks handover
๐Ÿ“
1 โ€” Shop Drawings
Structural ยท Architecture ยท MEP ยท Fit-out ยท Steelwork ยท Precast
โ–ผ
๐Ÿ›‘ Blocks construction โ€” hard stop
What it is
Contractor's detailed drawing showing exactly how they plan to build something โ€” dimensions, materials, connections, fixing details
Who reviews
The discipline engineer responsible for that element โ€” civil, structural, MEP, architect
Standard SLA
14 days (simple) ยท 21 days (complex)
If delayed
Construction of that element stops. Contractor may raise a delay claim against UAQ
How it differs from other submittals: Shop drawings are the most common submittal type and the highest volume. They go through technical engineering review โ€” not HSE, not facilities. Every discipline has its own shop drawings and each goes to the correct discipline reviewer. A civil drawing never goes to the MEP reviewer.
What to check on receipt
Title block complete โ€” project name, drawing number, revision, date, scale
Originator, checker, and approver signatures all present in title block
Contractor QA stamp present โ€” confirms internal review before submission
Revision clouds present if Rev B or higher โ€” all changed areas marked
Scale stated and legible โ€” an unreadable drawing cannot be reviewed
Transmittal clearly states "For Approval" or "For Review and Comment"
Drawing number matches the agreed document numbering convention
๐Ÿงฑ
2 โ€” Material Approvals
Product data sheets ยท Manufacturer certificates ยท Material samples ยท Technical data
โ–ผ
๐Ÿ›‘ Blocks procurement and installation โ€” hard stop
What it is
Contractor submits product data to prove the material they intend to use meets the specification requirements
Who reviews
Engineer for structural/MEP materials ยท Architect for finishes and visible elements ยท Both for items that affect both structure and aesthetics
Standard SLA
14โ€“21 days depending on complexity
If delayed
Contractor cannot order or install the material. Procurement lead times mean a 2-week review delay can cause a 2-month site delay
How it differs from other submittals: Material approvals are time-critical because of procurement lead times. The contractor needs approval weeks or months before the material is actually needed on site. As DC you must flag material approvals early โ€” a late approval here has a multiplied effect on the programme. Also, the reviewer may approve the material "subject to mock-up" โ€” meaning a physical sample must also be approved before installation can proceed.
What to check on receipt
Manufacturer's product data sheet attached โ€” not just a brochure
Third-party test certificates attached if the spec requires them
Specification clause reference stated โ€” which clause does this product satisfy?
Contractor's QC manager has signed confirming the product meets spec
Colour, finish, and grade all clearly stated and matching spec requirements
Country of origin stated โ€” some contracts restrict sourcing
๐Ÿ“‹
3 โ€” Method Statements
Work execution plans ยท Construction sequences ยท HSE procedures ยท Risk assessments
โ–ผ
๐Ÿ›‘ Blocks start of work โ€” hard stop ยท HSE requirement
What it is
A step-by-step description of how the contractor plans to carry out a specific operation โ€” sequencing, equipment, personnel, safety measures
Who reviews
Discipline engineer for technical compliance ยท HSE Manager for safety compliance ยท Both must approve before work starts
Standard SLA
14 days โ€” but urgent operations may need fast-tracking
If delayed
No work can start on that operation. HSE violation if contractor starts without approval โ€” UAQ is exposed to regulatory risk
How it differs from other submittals: Method statements are the only submittal type that requires HSE sign-off as a mandatory co-reviewer โ€” not optional. This is a legal requirement, not a preference. If a contractor starts high-risk work (piling, deep excavation, working at height, confined space) without an approved method statement, UAQ can be held liable for any accident. As DC, if you receive a method statement with no HSE review and the work is imminent, you must escalate to the HSE Manager and PM immediately.
What to check on receipt
Signed by method statement author, site manager, AND HSE manager โ€” all three
Risk assessment included โ€” hazards identified and control measures stated
Equipment list included with certifications referenced
Competency requirements stated for operatives
Emergency procedures included โ€” what happens if something goes wrong
Environmental protection measures stated if work near sensitive areas
If sub-contractor carries out the work โ€” sub-contractor must also sign
โœ…
4 โ€” Inspection and Test Plans (ITP)
Quality hold points ยท Witness points ยท Inspection checklists ยท Test procedures
โ–ผ
๐Ÿ›‘ Blocks inspections โ€” no inspection can proceed without approved ITP
What it is
A document that defines what inspections and tests will be done during construction, at what stage, by whom, and what the acceptance criteria are
Who reviews
Contractor QC Manager ยท Consultant QA Engineer ยท Client QA representative for critical works
Standard SLA
14 days
If delayed
No formal inspection can be carried out. Work progresses without witnessed quality checks โ€” major contractual and quality risk
How it differs from other submittals: The ITP is the only submittal that the reviewer must sign to participate in โ€” not just to approve. The consultant QA signs the ITP to confirm they will witness the hold points defined in it. If an ITP is not approved and work is inspected anyway, those inspections are not contractually valid. This is a legal quality record issue, not just an administrative one. At MASAR scale, critical ITPs โ€” piling, concrete pours, waterproofing โ€” must be on your urgent chase list.
What to check on receipt
Hold points (H) clearly marked โ€” work cannot proceed past these without witness sign-off
Witness points (W) clearly marked โ€” notification required, witness may attend
Review points (R) clearly marked โ€” contractor reviews own work, no witness needed
Acceptance criteria stated for each inspection point
Referenced codes and standards listed (ASTM, BS, ACI, etc.)
QC Manager and Site Engineer signatures on the submittal
๐ŸŽจ
5 โ€” Samples and Mock-ups
Material samples ยท Colour samples ยท Full-scale mock-ups ยท Finish panels ยท Prototype units
โ–ผ
โš ๏ธ Blocks finish work โ€” partial stop for visible and finished surfaces
What it is
A physical sample or built mock-up submitted for visual and quality approval before the contractor applies a finish to the actual building
Who reviews
Architect or interior designer for aesthetic approval ยท Engineer for structural or performance mock-ups ยท Client representative on landmark projects
Standard SLA
14โ€“21 days โ€” but mock-ups may require site visit
If delayed
Finish installation cannot start on that surface. Structural work continues but finish trades are blocked
How it differs from other submittals: Samples and mock-ups are the only submittal type that may require a physical site visit by the reviewer โ€” you cannot review a full-scale facade mock-up from a desk. As DC you must coordinate the inspection appointment and log it. Also, approved samples are kept on site as the benchmark โ€” they are not filed in your office. Your role is to log that the sample was approved and cross-reference it to the material approval for the same product.
What to check on receipt
Sample clearly labelled โ€” product name, manufacturer, colour code, batch reference
Cross-reference to the approved material submittal stated
Location of the mock-up on site stated if it is a full-scale mock-up
Proposed inspection date suggested by contractor
Duplicate sample available โ€” one for reviewer to keep, one to remain on site as benchmark
๐Ÿ“š
6 โ€” O&M Manuals and Product Data
Operation and maintenance manuals ยท Warranties ยท Technical data packages ยท As-installed schedules
โ–ผ
โœ“ Does not block construction โ€” but blocks handover and final payment
What it is
Documentation provided at end of construction explaining how installed systems and equipment should be operated and maintained by the building owner
Who reviews
Facilities Manager or building operator ยท MEP engineer for technical systems ยท Client's facilities team
Standard SLA
21โ€“28 days โ€” larger scope than other submittal types
If delayed
Handover certificate cannot be issued. Final payment to contractor is withheld until O&M package is complete and approved
How it differs from other submittals: O&M submittals are the only type where delay does not stop construction โ€” but the financial consequence is severe. Contractors sometimes deprioritise O&M submissions because the work is done and they have moved on. As DC you must start chasing O&M submissions 3 months before practical completion โ€” not after. A missing O&M manual for one system can hold up the entire handover and withhold millions in final payment to the contractor, which they will blame on UAQ's review team.
What to check on receipt
Manual covers the correct installed system โ€” not a generic manufacturer document
As-installed drawings included โ€” not the design drawings, the actual as-built
Warranty certificates included with correct start date and duration
Spare parts list and recommended maintenance schedule included
Emergency shutdown procedures included for all active systems
Manufacturer's contact details for warranty claims included
Table of contents and document index present โ€” O&M packages are large
Your priority rule as DC โ€” how to chase when everything is overdue
1.Method statements for work starting this week โ€” HSE legal obligation, no grace period
2.ITPs for works currently on site โ€” inspections cannot happen without them
3.Shop drawings on the critical path โ€” delays here become programme delays
4.Material approvals for items with long procurement lead times
5.Samples and mock-ups โ€” finish work dependent on these
6.O&M manuals โ€” long lead time on chase, but start early before practical completion
Documents
โœ•
Claude โ€” DC Intelligence
Analysing project context...
โœ•
Analysing...
Responses are generated by Claude AI. Always verify against your project contract and UAQ procedures before acting.